Advantest EVA100 test equipment

Digital, mixed-signal and application-development workflow

Advantest EVA100 Application and Test Engineering

Digital and mixed-signal test programs are developed around the actual EVA100 boards and device specifications. CP, FT, IP validation and failure analysis use Sequence, Timing, Level, Device Block, virtual instruments and Shmoo for development and debug.

EVA100 equipment visual. Boards, instrument resources and software capability follow the actual system configuration.
SignalsDigital + mixed signalResources follow actual system configuration
DevicesLogic / PMIC / conversion / sensorTest methods follow device specification
StationsCP / FT / IP / FAApplication paths organized by project
DebugSequence / Timing / Level / ShmooGraphical toolchain
Equipment and engineering solution

Applications

Designed for the following probe card manufacturing, test and maintenance tasks.

Device test-program development

Build projects, items and judgements around data sheet, board and tester resources.

Engineering validation and failure analysis

Use virtual instruments, sequence and Shmoo to localize voltage, current, timing and margin issues.

CP/FT flow migration

Map equipment resources, interface board, test program and data output into an acceptable migration.

SPECIFICATIONS

Specifications

The final configuration follows the card, interfaces, site conditions and acceptance items.

ItemSpecification / configurationNotes
Signal typesDigital and mixed signalSubject to actual boards and system resources
Device typesLogic, PMIC, comparator, amplifier, audio/video converter and sensorCoverage follows device specification and tester resources
Application stationsCP, FT, IP validation and failure analysisTest interface and automation follow station configuration
Virtual instrumentsVoltmeter, ammeter, voltage source, current source and clockAvailable range depends on system resources
Development toolsSequence, Pin, Timing, Level and Device BlockFor test-program organization and debug
AnalysisShmoo and result dataAxes, steps and judgement follow device needs
DeliveryEnvironment review, interface board, program, golden sample, report and trainingScope is defined in project documents
WORKFLOW

Workflow

01

Inventory system and device

Confirm EVA100 configuration, boards, interfaces, device specification and existing program.

02

Map items to resources

Map specifications to power, digital, mixed-signal and clock resources.

03

Develop and debug

Use sequence, timing, level, device blocks and Shmoo to complete validation.

04

Golden sample and delivery

Verify results with known samples and complete reporting, version control and training.

FAT / SAT

Project delivery

01

Sample evaluation

Confirm the object, interfaces, current state, failure modes and available validation samples.

02

Technical agreement

Define configuration, measurement method, limits, takt, data interfaces and responsibilities.

03

FAT

Verify functions, repeatability, reporting and exception handling with agreed samples.

04

SAT

Complete site integration, training, upstream/downstream interfaces and issue closure.

CONFIGURATION

Configuration and acceptance

System configuration, optional items and acceptance conditions are summarized below.

Application scope

Supports CP/FT, IP validation and failure analysis for digital and mixed-signal devices.

System configuration

Available instruments, boards and software functions follow the target EVA100 system.

Acceptance

Actual system configuration, device specification, interface board and golden sample define the delivery scope.

Share the card, interfaces and target

Send the sample, installed equipment, current issue and target takt. We will acknowledge receipt within one business day.