
Equipment scope, condition review and project delivery
Surplus Semiconductor Equipment and Engineering
For ASML lithography, Accretech/TEL probers, Advantest ATE and related equipment, candidate units are matched to the requested model and use. Serial number, configuration, accessories, power-up state, logistics, installation and acceptance are confirmed unit by unit.
The same points in words
- Lithography
- Model and condition confirmed by inquiry
- Probers
- UF200, UF3000 and P-12XL families
- Testers
- V93000, T5377 and project scope
- Delivery
- Confirmed per unit
- Refurbished stock
- Refurbished at the Wuxi refurbishment base; model and condition confirmed per inquiry
Applications
Designed for the following probe card manufacturing, test and maintenance tasks.
Production capacity addition
Spare and replacement planning
Cross-region relocation and recovery
Who buys them
The same points in words
- Production capacity addition
- Match model, options, facility and interfaces against available equipment.
- Spare and replacement planning
- Find equipment or parts around discontinued systems, current process and compatibility boundaries.
- Cross-region relocation and recovery
- Fix list, condition, disassembly, power-up and acceptance responsibility before logistics.
- Who buys them
- Customers span wafer fabs, OSATs, design houses running in-house test, probe-card makers and research institutes.
Specifications
The final configuration follows the card, interfaces, site conditions and acceptance items.
See the full specification table
| Item | Specification / configuration | Notes |
|---|---|---|
| Engineering support | Power-up check, interface mapping, data/image backup and recovery | Performed within equipment condition and authorization scope |
| Prober coverage | TSK 8-inch APM90A, UF200, UF200A, UF200SA, UF190B; 12-inch UF3000, UF3000ex, UF300, UF300A. TEL 8-inch P-8, P-8XL; 12-inch P-12, P-12XL, P-12XLn | The range our material records that we can work on, not a stock list; maker model names imply no authorisation or certification |
| Tester coverage | Advantest T3347, T5365, T5371, T5375/6/7/7S, T5581, T5588, T5830, T5833, T2000MS, 93000, B6700; Teradyne J973, A580, CATALYST, J750, UltraFlex, Magnum 5 | As above; the Magnum 5 is sales and service scope plus probe-card solution support, with no record of delivering the tester itself |
| Commercial terms | We import and clear customs on our own account, trade domestically in RMB and issue a 13% VAT special invoice | Prices and quotation terms are settled per project |
| Where machines come from | An equipment network across East Asia, Southeast Asia, Europe and the Americas | Serial number, configuration and condition checked machine by machine |
Workflow
01 Submit equipment requirements
02 Review candidate units
03 Define the delivery list
04 Site handoff
The same points in words
- Submit equipment requirements
- State model, use, key options, region, budget and time window.
- Review candidate units
- Confirm serial, configuration, accessories, condition and available test records.
- Define the delivery list
- Write equipment, missing items, logistics, installation, facility and acceptance into the quotation or contract.
- Site handoff
- Complete arrival, installation, power-up, function review and issue list as agreed.
Project delivery
Sample evaluation
Technical agreement
FAT
SAT
The same points in words
- Sample evaluation
- Confirm the object, interfaces, current state, failure modes and available validation samples.
- Technical agreement
- Define configuration, measurement method, limits, takt, data interfaces and responsibilities.
- FAT
- Verify functions, repeatability, reporting and exception handling with agreed samples.
- SAT
- Complete site integration, training, upstream/downstream interfaces and issue closure.
Configuration and acceptance
System configuration, optional items and acceptance conditions are summarized below.
Inventory confirmation
Inventory, configuration and condition follow the written records for the specific unit at inquiry time.
Unit information
Page images identify equipment families; serial number, configuration and appearance are provided separately.
Acceptance
Serial number, configuration list, condition record and contract acceptance terms define the handoff.
Share the card, interfaces and target
Send the sample, installed equipment, current issue and target takt. We will acknowledge receipt within one business day.
